Skip to main content
Priority Definitions
- Priority 1 - Urgent work that will prevent immediate closure of premises and/or address an immediate high risk to the health and safety of occupants and/or remedy a serious breach of legislation.
- Priority 2 - Essential work required within two years that will prevent serious deterioration of the fabric or services and/or address a medium risk to the health and safety of occupants and/or remedy a less serious breach of legislation.
- Priority 3 - Desirable work required within three to five years that will prevent deterioration of the fabric or services and/or address a low risk to the health and safety of occupants and/or remedy a minor breach of legislation.
- Priority 4 - Long term work required outside the five year planning period that will prevent deterioration of the fabric or services.
Condition Definitions
- A - Good: Performing as intended and operating efficiently.
- B - Satisfactory: Performing as intended but exhibiting minor deterioration.
- C - Poor: Exhibiting major defects and/or not operating as intended.
- D - Bad : Life expired and/or serious risk of imminent failure.